Find a cosmetics factory to process a skin care type moisturizing spray. How long will it take to get the goods
The delivery time of skin care type moisturizing spray processed by cosmetics factory is affected by various factors, as follows:
In the case of ready-made packaging materials: If the brand has ready-made packaging materials that have been inspected and qualified by the OEM factory, the production cycle is generally around 15 working days. This is because after receiving qualified packaging materials, the factory can directly arrange production processes such as batching, mixing, stirring, filling, and sealing. Usually, it takes 1-2 days to complete the ingredients and pretreatment, 3-5 days for mixing and stirring, 5-7 days for filling and sealing, and an additional 2-3 days for quality inspection and packaging before shipment.
In the case of no ready-made packaging materials: If there are no packaging materials, it is necessary to first design and purchase packaging materials. The production cycle of packaging materials generally ranges from 12-30 days, and after the packaging materials are in place, production takes about 15 working days. The entire cycle is about 30-45 days. The design and production time of packaging materials is relatively long. If the supplier does not have inventory, it may take 12-30 days from the finalization of the design to the production of qualified packaging materials, depending on the complexity of the packaging materials. For example, regular plastic bottles may take 12-15 days, while glass bottles with special printing or styling may take 20-30 days.
The situation of new product processing: If it is new product processing, in addition to packaging materials and production time, it is also necessary to consider the early project planning time, such as packaging material design, packaging material selection, copywriting planning, and inspection filing. These tasks require close cooperation between the client and the factory. If the client can quickly determine various requirements, the factory can successfully complete the design and planning, and the product inspection and filing can also be passed smoothly, the initial planning usually takes about 30-180 days. Adding packaging material production and product manufacturing time, it may take around 45-75 days for new products to be ordered and shipped. If the customer repeatedly modifies the requirements, or if there are problems with product filing that require readjustment, the shipment time will be later.
Other influencing factors: The production schedule of the factory can also affect the delivery time. If the factory has full orders, it may need to wait in line for production, which will prolong the overall delivery time. In addition, the complexity of product formulas, special process requirements, and force majeure factors (such as factory power outages, weather conditions, packaging production or transportation delays, etc.) may also lead to extended production cycles.